Project
Watersports Retreat Project
Project Details
Category:
- Dock Construction, Seawall Construction, Synthetic Docking, Water Sports Dock
Year:
2024
Location:
Bird Key, Sarasota, FL













About the project
The snowbird homeowners wanted a clean and efficient waterfront setup, focused on boating access, watersports, and minimal maintenance while spending much of the year outside of Florida, which also required stabilizing their shoreline with a new seawall.
Solutions
Bay & Key completed a full waterfront project including the seawall construction and a custom Trex boardwalk and dock system featuring a 24K beamless lift, dedicated water sports floating dock, custom IPE benches, and integrated lighting throughout the project. The design prioritized easy access, low maintenance ownership, and a refined modern waterfront appearance.
Other projects
- Dock Renovation, Outdoor Living Design, Waterfront Deck Expansion
Cantilever Waterfront Terrace Project
- Boardwalk Construction, Hurricane-Resilient Dock, Underwater Lighting
Illuminated Harbor Project
- Dock Rebuild, Hurricane-Resilient Dock, Luxury Waterfront
Storm-Resilient Waterfront Project
- Builder Collaboration, New Construction Dock, Safety Railings
Estate Boardwalk Project
- Dock Construction, Seawall Construction, Synthetic Docking, Water Sports Dock
Watersports Retreat Project
- Floating Dock, Seawall Construction, Synthetic Docking
Seawall Restoration Project
Ready to
Start your project?
Discuss your waterfront project with our team and receive a personalized estimate.