Project

Illuminated Harbor Project

This neighboring waterfront project was completed during an active hurricane season and became a real-world demonstration of Bay & Key’s storm-resilient construction methods.

Project Details

Category:

Year:

2024

Location:

Sarasota, FL

About the project

This neighboring waterfront project was completed during an active hurricane season and became a real-world demonstration of Bay & Key’s storm-resilient construction methods.

Solutions

Bay & Key completed the primary dock before Hurricane Helene and later finalized the boardwalk after the storm passed. The completed structure successfully endured the severe weather conditions while maintaining both structural integrity and luxury waterfront aesthetics.

Other projects

Ready to
Start  your project?

Discuss your waterfront project with our team and receive a personalized estimate.